Brite-Line’s Temporary Preformed Tapes Deliver Flexible & Durable Marking for Jiangxi Expressway Expansion
Brite-Line's temporary preformed road marking tapes have been successfully deployed in the Jiangxi Expressway expansion project, providing a durable, easy-to-remove, and rapidly installed solution for temporary traffic control in live-traffic highway construction.
Specifically engineered for dynamic work zones, the temporary preformed tapes are manufactured using a proprietary process that ensures flexibility, adhesion, and structural integrity. A key innovation is the liner-free design, which streamlines installation by eliminating the need to remove protective backing—significantly reducing deployment time and labor.
The tapes offer strong surface adaptability, adhering securely to asphalt, concrete, and slightly uneven substrates without lifting or cracking. They provide high retroreflectivity for clear day and night visibility, even in wet conditions, and are resistant to water, abrasion, and alkali—ensuring reliable performance under continuous traffic. With a peel adhesion of 12N/25mm, the tapes remain securely in place during use and can be removed manually without leaving residue, supporting environmentally responsible site restoration.
Deployment is further optimized through Brite-Line’s fully automated laying system, which integrates unrolling, alignment, and compaction into a single high-speed operation. This ensures precise, wrinkle-free application while dramatically improving installation efficiency compared to manual methods.
By combining advanced product design with automated application technology, Brite-Line has provided a reliable, efficient, and sustainable marking system for the Jiangxi expressway expansion—proving its value in delivering safe and compliant temporary traffic guidance for major infrastructure projects worldwide.